The purpose of the project is to provide structurally-sound bridges over the Blackfoot River, and to improve the recreational use of the river.   Work is expected to include removing the current bridges, including the existing piers and abutments, and constructing two new bridges at the same location and on the same alignment.  The configuration for the new bridges would not include bridge piers within the river channel.  Replacement of bridge approach sections, slope modification and stabilization, and scour protection is also anticipated.  The project would also evaluate potential connectivity with trails and recreational areas in the vicinity of the bridges. The current phase of this project includes preliminary design and environmental documentation only.  There will be no construction associated with this phase of the project.  Funding has not yet been identified for a future project phase involving final design and construction.

MDT attempts to provide accommodations for any known disability that may interfere with a person’s participation in any service, program or activity of our department.  If you require reasonable accommodations to participate in this meeting, please call Sarah Nicolai at (406) 324-7412 at least two days before the meeting.  For the hearing impaired, the TTY number is (406) 444-7696 or 1-800-335-7592, or call Montana Relay at 711.  Alternative accessible formats of this information will be provided upon request.